Settle Hydro Diary - June 2015

Wednesday, 1 July 2015  |  Admin

 
 
Generation during June was very low (1800kWh) due to low river level as a consequence of low rainfall.

The Hydro is temporarily out of commission whilst an upgraded control system is installed which will increase output by at least 50%. Plan to be back generating by end July.
 
 